Shop progress. Got some of the toys in the shop as well as the car project and have been running wiring for electrical. I ordered a couple industrial LED 8' light fixtures that I want to try out. If those work out well I will order some more, but in the meantime, I am running the wiring for everything and tying it in to the breaker box. Outlets also being installed in locations I think make sense. I am also in the process of finishing installing the septic system. That part should be done today.
As per request for updated pics. Still some things to do such as build the loft and run a fee more outlets, but I have been working out of the shop. I am saving up for the new paint booth as well.